The first stage is to obtain planning permission and apply for a new grid connection. It typically takes between 6 and 12 months to navigate the planning process although in some instances this can be achieved in a faster time frame. Once grid connection and planning permission are secured, we can pre-accredit your project securing the best rate of FiT available for 12 months. This allows time to order your product, grid upgrade works to be completed by your local DNO and for us to install your turbine.
A typical project takes 12-18 months to complete however this varies on a case by case basis.